The cable is tight , as seen train is moving forward slowly, which helps pull the rail through the rollers and from the train. This sequence is repeated to get rail from the train to the ground. |
Date:
9/21/2024 |
Location:
Sewaren, NJ Map  |
Views:
72 |
Collection Of:

Steve Coraggio |
|
Author: Steve Coraggio
|
 |
Picture Categories: RollingStock,Track,Action |
This picture is part of album: CSX Work Train W- 029 Lays track for a Siding In Sewaren,NJ |